중국 CCC
90 days
* it could result in a delay in processing:
if application documents are not complete,
if there are problems with testing in the Test Lab,
if there is a deviation in the audit.
Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2
Plant is classified after the initial audit in A, B, C, D.
A: Factory audit takes place once every 2 years.
B or C: Factory audit takes place once a year.
D: Factory audit takes place at least twice a year.
Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2
Initial Audit: 2 - 4 man day per model series
FI audit: 1 - 2 man day per model series
Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,
CCAP-C11-01: 2014 / A1 page 14, item 10.3.2
Factory audit is performed according to IR CNCA-C11-01 Appendix 5
- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)
-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.
-Overview control: control of property, model and supplier of core material and core components, etc.
- Checking product compliance: running tests, final tests, etc.
Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.
Product Check: Requalification Test
Change control: control of change request, etc.
Control of serious quality problems: customer complaint, recall, etc.
Source: IR CNCA-C11-01 Appendix 5
-Application form
License in copy
Questionnaire including brief information about the company, production process, list of core production facilities, list of core test instruments, proof of registered trademark, etc.
Car structure and technical parameters
-COP control plan
-Declaration: how is type, series defined
-Declaration: how is VIN defined
-Explanation: we distinguish the different types by external marking
-Declaration: Operating instructions in Chinese
-COC certificate
-Review
-Quality Manual
-Quality system certificates in copy
-Etc.
Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1
Step 1: Group car first after series defined by manufacturer
Step 2: Units are removed from the same series
It can not be defined as a unit if:
- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.
- car series is not equal
- position of the engine is not equal (front, middle, rear)
- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)
- Drive is not equal (four-wheel, non-four-wheel)
- Sum of the axis is not equal
- Etc.
Within one unit:
- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2
- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15
- Limit parameters (total weight, distribution of front and rear axle): 20%
- Etc.
Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)
Limit within one unit: Engine KW: 30%, Displacement: 20%
Limit value for engine KW: 50%, engine capacity: 50%
Limit within one unit: total weight: 20%
Source: IR CNCA-C11-01 Appendix 2
See CCAP-C11-01: 2014 / A1 page 29-45
See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27
당신은 당신의 속도로 일합니다. 포털을 통해 프로젝트를 독립적으로 처리 할 수있을뿐만 아니라 개인적인 지원에 대해서도 문의 할 수 있습니다. 따라서 우리는 자신의 프로세스를 설계 할 수있는 기회를 갖기 위해 노력했습니다.
우리는 경험있는 직원의 노하우 나 지원을 잊지 않고 자신의 인증 과정을 수행 할 수있는 기회를 제공합니다. 온라인 시스템은 다양한 인증을 위해 설계되었으며 기성품 양식 및 표는 물론 FAQ 목록을 제공 할뿐만 아니라 직원 중 한 명과 공개 된 질문을 명확히하기위한 모듈을 제공합니다.
우리의 빠른 시간에 비즈니스 삶의 변화는 끊임없는 동반입니다. 그것은 매우 빨리 박살낼 수 있습니다. 이에 대한 내부적 외부 적 이유가 있습니다. CS는 변경 중에 적합성에 대한 개요를 제공합니다.
우리는 제한된 시간과 재정적 인 역량을 가지고 있으며 포괄적 인 서비스를 제공하기를 원하며 협력은 관련 기관들 사이에서만 의미가 있습니다. 이것들은 신뢰할 수있는 구조와 훌륭한 대인 관계를 가지고 있습니다.